CURRENT PROJECTS

 

LBCC currently has projects underway in the following areas:

Seton Medical Center Williamson -- Round Rock, Texas

The Seton Medical Center Williamson is a state-of-the-art facility comprised of more than 360,000 square feet of patient treatment areas and rooms located on a 74-acre site. The structural frame for the 6-story bed tower is designed as a two-way cast-inplace flat plate in order to maximize the interstitial floor space for mechanical systems and to reduce forming costs. LBCC staff worked closely with the project developer, design team, materials testing laboratory and material suppliers to assure that the concrete provided achieved the high early strengths needed for the flat plate design. Lott Brothers Construction Company provided construction services for the project developer, UHS Building Solutions, Inc.

Work on the excavation and foundation for the fast tracked project, incorporating both pre-cast concrete and cast-in-place concrete structural elements, began prior to completion of the design of the facility. In addition to construction services, LBCC provided input during pre-construction concerning constructability and design alternatives for foundation elements, finishes and exterior cladding.

The first phase of the campus includes a 181-bed hospital, an ambulatory surgery center, a diagnostic and imaging center, a dedicated Women’s Center with separate entrance for OB/GYN, labor and delivery, postpartum care, transitional and Level II nursery, a cancer center and a complex of medical offices. Seton Medical Center is equipped with the latest technology, including electronic medical records, automated delivery of critical test results, room service, and wireless access throughout the facility. Facility design elements combine a healing garden, waterscape, outdoor courtyard, nature-inspired interior, a large chapel and a serene interfaith reflection room creating a comforting and peaceful environment.

Start Date: 10/06
Projected Finish Date: 12/07

Iraan General Hospital -- Iraan, Texas

Lott Brothers Construction Company is currently constructing this 35,000 square foot replacement hospital for the Iraan Hospital District. This facility is located in west Texas
at the southern end of the Permian Basin Oil Field. Accordingly, the hospital and staff at the existing facility provide healthcare for a large portion of southwestern Texas. The new facility, including its helipad and emergency treatment facilities, will provide additional needed capabilities.

LBCC staff members are working closely with the local district staff, Parsons-Meta and STG Architects to identify capable subcontractors and suppliers in this sparsely populated area of Texas. LBCC identified subcontractors and suppliers from San Antonio, Midland-Odessa, San Angelo, Abilene, Austin and other locations in west Texas to fulfill project requirements. A portable concrete batch plant has been erected at the site to facilitate the placement of concrete elements at the project. Local sources for select fill were identified to reduce cost. The facility is projected to open in 2008.

Start Date: 07/07
Finish Date: